隧道变形缝接水盒

面议元2023-03-11 20:18:19
  • 段经理
  • 查看联系方式
  • 微信在线

段经理

注册时间:2022-11-15

————认证资质————

  • 个人未认证
  • 企业未认证
  • 微信未认证
  • 手机已认证

线上沟通

与商家沟通核实商家资质

线下服务

核实商家身份所有交流确保留有证据

服务售后

有保障期的服务请与商家确定保障实效

详情

服务 基础建筑材料  详细地址 路北
QQ号 3407742055  

隧道变形缝接水盒

用于混凝土变形缝,结构完成后,用水泥钉固定在墙面上,周边抹上聚氨酯密封胶防水,接水盒防止漏水后外溢。

For the concrete deformation joint, after the structure is completed, it is fixed on the wall with cement studs, and the polyurethane sealant is waterproof on the periphery, and the water box prevents leakage after leakage.

1.主体结构与隧道交接变形缝,与附属结构接口处变形缝。接水盒在主体交接安装在每条变形缝的顶板和侧 墙位置。

The 1. main structure is connected to the tunnel with the deformation joint, and the deformation joint at the interface of the auxiliary structure. The water box is installed at the top and side wall of each deformation joint in the main connection.

不锈钢接水盒每块长2000mm,宽200mm,两翼宽各30mm,厚度为1mm。

The stainless steel receiving box is 2000mm with a width of 200mm, and the width of the two wings is 30mm, and the thickness is 1mm.

2、施工准备

2. Construction preparation

材料:1mm厚不锈钢接水盒、聚硫密封胶、密封胶、螺钉。

工具:电镐,电钻。

Materials 1mm thick stainless steel receiving box, polysulfide sealant, sealant, screw. Tools electric drill.

3、施工工艺

3. Construction technology

施工顺序:变形缝清理涂抹聚硫密封胶接水盒安装、固定接水盒密封处理

Construction order deforming seam cleaning, smearing polysulfide sealant, installing water box, fixing and sealing treatment of water box

1)、首先将变形缝清理干净,保证变形缝处混凝土面的平整。

1), first, the deformation joint is cleaned up to ensure the smoothness of the concrete surface at the deformation seam.

2)、然后在变形缝内涂抹15mm深的聚硫密封胶。

2), then apply 15mm deep polysulfide sealant in the deformation seam.

3)、接水盒应安装在顶板变形缝和侧墙变形缝上,安装时变形缝应位于接水盒中间位置。

3), the water box should be installed on the deformation seam of the roof and the side wall, and the deformation joint should be located in the middle position of the water box when the installation is installed.

4)、接水盒两翼用间距为300mm的螺钉固定并用密封胶密封。在接水盒的搭接处应确保接

4), the two wings of the water box are fixed with a screw spacing of 300mm and sealed with sealant. In the lap of the water box, the connection should be ensured.

水盒的搭接长度不小于100mm,并且下侧的接水盒包住上侧的接水盒,使水不能从接水盒

The water box of the lap length not less than 100mm, and the water box on the side of the living water box connected below, the water from water box

漏出。

展开更多
酷易搜提醒您:
1)为了您的资金安全,请选择见面交易,任何要求预付定金、汇款等方式均存在风险,谨防上当受骗!
2)确认收货前请仔细核验产品质量,避免出现以次充好的情况。
3)该信息由酷易搜网用户自行发布,其真实性及合法性由发布人负责,酷易搜网仅引用以供用户参考,详情请阅读酷易搜网免责条款。查看详情>
免费留言
  • !请输入留言内容

  • 看不清?点击更换

    !请输入您的手机号

    !请输入验证码

    !请输入手机动态码

提示×
该账号认证已过期,无法显示联系电话。
微信在线
关闭
段经理
×