服务 | 基础建筑材料 | 详细地址 | 路北 |
QQ号 | 3407742055 |
1.5mm不绣钢接水盒
用于混凝土变形缝,施工缝,结构完成后,用不锈钢膨胀螺栓固定在墙面上,周边抹上聚氨酯密封胶防水,接水盒防止漏水后外溢。
For the concrete deformation joint and construction joint, the stainless steel expansion bolt is fixed on the wall after completion of the structure, and the polyurethane sealant is waterproof on the periphery, and the water box is prevented from spillover after leakage.
1.主体结构与隧道交接变形缝,与附属结构接口处变形缝。接水盒在主体交接安装在每条变形缝的顶板和侧墙位置。
The 1. main structure is connected to the tunnel with the deformation joint, and the deformation joint at the interface of the auxiliary structure. The water box is installed at the top and side wall of each deformation joint in the main connection.
2、施工准备
2. Construction preparation
材料:不锈钢接水盒、聚硫密封胶、密封胶、螺钉。
工具:电镐,电钻。
Materials stainless steel water box, polysulfide sealant, sealant, screw. Tools electric drill.
3、施工工艺
3. Construction technology
施工顺序:变形缝清理涂抹聚硫密封胶接水盒安装、固定接水盒密封处理
Construction order deforming seam cleaning, smearing polysulfide sealant, installing water box, fixing and sealing treatment of water box
1)、首先将变形缝清理干净,保证变形缝处混凝土面的平整。
1), first, the deformation joint is cleaned up to ensure the smoothness of the concrete surface at the deformation seam.
2)、然后在变形缝内涂抹15mm深的聚硫密封胶。
2), then apply 15mm deep polysulfide sealant in the deformation seam.
3)、接水盒应安装在顶板变形缝和侧墙变形缝上,安装时变形缝应位于接水盒中间位置。
3), the water box should be installed on the deformation seam of the roof and the side wall, and the deformation joint should be located in the middle position of the water box when the installation is installed.
2)确认收货前请仔细核验产品质量,避免出现以次充好的情况。